Slow Payment Is a 14% Tax. Here Is What It Costs a $20M Contractor.

Rabbet priced slow payment at $299 billion in 2025 — a hidden 14% tax on U.S. construction, up from $208 billion in 2022. For a $20M general contractor, the retainage carry alone runs about $180,000 a year, roughly 30% of net profit. The math, the Texas statute most GCs never invoke, and the four-number test.

A $20 million general contractor can tell you, to the dollar, what the steel package cost. The same contractor usually cannot tell you, inside ten minutes, what it cost to wait for money that was already earned.

That second number is larger than most people expect, it recurs every year, and it has never once appeared on a profit and loss statement as itself.

COST OF SLOW PAYMENT, U.S.
$299B
in 2025 — Rabbet, 2025 Construction Payments Report
GC HOURS LOST, PER MONTH
65
to payment administration — same report
RETAINAGE CARRY ON $20M
$180K
$2M held 12 months at a 9% line of credit

What does slow payment actually cost the industry?

Rabbet has priced it annually since 2021, and the line only goes one direction.

The excess cost of slow payment to U.S. constructionRABBET, CONSTRUCTION PAYMENTS REPORT — ANNUAL CONTRACTOR SURVEY2022$208B2024$280B2025$299B — described by the report as a hidden 14% tax on the industry2025 figure from a survey of 125 U.S. contractors (97 general contractors, 28 subcontractors), fielded 2025. Self-reported.

Hold the national total loosely. It rests on a survey of 125 contractors, which is a small sample for a number with a "B" on the end, and every respondent is reporting on themselves. What survives the methodology is the direction and the mechanism: the cost of waiting is real, it is growing, and it is paid in interest and administration rather than in anything anyone would recognize as a loss.

The same report found that 88% of general contractors declined to bid something in the preceding year because of an owner's slow-pay reputation, and that 91% factor payment reputation into their bids at all. That second number is the more interesting one. It means the market has already priced this — just not on your P&L.

What does it cost your shop, specifically?

National totals do not change behavior. Four numbers from your own books do.

Take a reference contractor: $20,000,000 in annual volume, 10% retention, held an average of twelve months, borrowing at 9% on the line of credit.

InputValue
Annual volume$20,000,000
Retention rate10%
Retainage outstanding$2,000,000
Average days held365
Cost of capital (line of credit)9.0%
Annual carrying cost$180,000
Net profit at a 3% net margin$600,000
Carrying cost as a share of net profit30%

Thirty percent of the year's profit, spent on the privilege of waiting for money that was earned and already spent to produce.

Read that against net, not gross, because the gross number flatters everything. CFMA's 2026 Financial Benchmarker — built from 1,359 verified financial statements submitted by contractors and their CPAs, released in September 2026 — puts industry-average net income before taxes at 6.8%, and that blends in specialty trades with much better economics. Pure general contracting and construction management work routinely runs lower. At 3% net, a $20M shop clears about $600,000 for the year, and the retainage carry is a third of it.

Then add the administration. Rabbet's 65 hours a month is 780 hours a year. At a loaded internal rate of $95 an hour — our arithmetic on their figure, not theirs — that is roughly $74,000 of salaried capacity spent moving money that was never in dispute.

Why does this never show up as a problem?

Three mechanisms, and none of them is carelessness.

The two halves live in different accounts. Retainage receivable sits on the balance sheet looking like an asset, because it is one. The interest you pay to survive its absence sits in interest expense, undifferentiated, next to the truck notes. No report connects them. The cost of waiting is never attributed to the thing that caused the wait, so it is never anyone's variance to explain.

Nothing fails. There is no bad day, no phone call, no line item. A blown job gets a post-mortem and everyone in the room learns something. A process that quietly costs $180,000 a year and never breaks gets nothing, because nobody does a post-mortem on a process that never failed loudly. That is the general shape of every structural leak we have mapped: the information exists, but it lands in the wrong system, on the wrong desk, or three months after the decision it should have informed.

The third reason is relational, and it is the biggest one. Everybody in the chain believes that asking hard about retainage costs you the next job. So a measurable cost gets traded for a presumed risk that nobody has ever actually tested. Meanwhile 88% of your peers are declining bids over payment reputation — which means the testing is happening, just in the other direction.

What does Texas law already give you?

Most general contractors in this state are carrying rights they have never invoked. Three worth knowing, with the standing caveat that this is general information, not legal advice, and that notice requirements decide cases:

Interest accrues by statute, not by negotiation. On private projects, Texas Property Code Section 28.004 sets interest on an overdue, undisputed payment at 1.5% per month — 18% a year — starting the day after payment becomes due. Chapter 28 also fixes the clock: an owner generally has 35 days from receipt of an invoice for properly performed work, and a contractor has 7 days from receiving the owner's payment to pay the subs covered by it. One letter citing the statute changes behavior more reliably than five phone calls. Have your attorney confirm the notice requirements before you send it.

Reserved funds are the owner's obligation, and the vocabulary changed. Section 53.101 requires an owner to reserve 10% of the contract price during the work and for 30 days after completion. House Bill 2237, effective January 1, 2022 for original contracts signed on or after that date, renamed what used to be called "statutory retainage" to reserved funds, and reserved the word retainage for the contractual withholding between a contractor and its subs. If your subcontract language still mixes the two terms, it predates the statute.

Unsigned change orders now have a stopping point. The 2023 amendments added Section 28.0091 to the Property Code, effective for contracts entered into on or after September 1, 2023. Once the cumulative value of owner-directed additional work without a written, fully executed change order exceeds 10% of the original contract amount, a contractor or subcontractor may decline to proceed with further additional work — and is not responsible for damages associated with that election. That is directly adjacent to the other half of this problem: the work you did but never billed.

The four-number test

This takes under an hour and requires no software purchase.

  1. Total retainage receivable, right now. One number out of the accounting system.
  2. Your actual line-of-credit rate. Not the rate you remember. The one on the last statement.
  3. Multiply, then divide by last year's net profit. That percentage is the test.
  4. Days held, by owner. Sort descending. This is the one nobody has, and the one that changes the next go/no-go.

If nobody in your company can produce the third number inside ten minutes, it is not being managed — and it is likely the single largest uncontested expense in the business.

Field Guide No. 01

Seven leaks, one diagnostic question each.

The Contractor Profit Leak Audit maps seven places general contractors lose money that never show up as a line item — retainage carry is only number three. Twenty-one scored questions, about fifteen minutes, or download the full guide.

Run the Profit Leak Audit

What actually fixes it?

In order of difficulty, cheapest first.

Compute it. The carrying cost does not become a managed number until it exists. Put it on the monthly package next to the interest expense it explains.

Negotiate reduced retention at 50% completion. It is in more contracts than most general contractors ever invoke, and asking is free.

Bill retainage on completed, accepted scopes rather than waiting for full closeout. The sitework sub finished in month three; there is no reason his retention waits for the punch list on a building he never touched.

Track days-held by owner. This is the control that compounds. Once you know which owners are genuinely expensive to work for, that number belongs in the go/no-go standard — which is the same place the cost of losing a pursuit belongs, and for the same reason.

Price a retainage bond. Typically 1–3% a year of the held amount to release the cash, against the 9% you are borrowing at. Sometimes the arithmetic is obvious and nobody has run it.

Put the statute in writing. Not as a threat. As a term, cited once, early, by an attorney who confirmed the notice requirements.

Why this is a visibility problem, not a discipline problem

Every item on that list is measurement, not effort. You are not asking anyone to work harder. You are asking a number that already exists — in the accounting system, on the bank statement, in the aging report — to arrive somewhere it can be acted on.

That is the whole argument, and it is the same argument we make about the burden rate nobody recalculated, about weekly estimate-versus-actual, about the financial pipeline from field to estimate, and about the 95.5% of construction data that gets captured and never used. Contractors who lose money to structural leaks are not undisciplined. Most of them are the hardest-working people in any room they walk into. They are operating a business whose information moves slower than its decisions, and discipline cannot close that gap. Only a system can.

The practical version is boring and it works: a standing monthly number for retainage carry, a days-held column sorted descending, a certificate expiration list, and a reason-for-lost-time field on the daily report. Four small pipes. We put the build order for that kind of work in the first system, and the ninety-day order to build it in, and the broader architecture in the connective layer.

Your P&L will tell you that you lost money. It will never tell you where. That part you have to build.

Sources

  • Rabbet. 2025 Construction Payments Report. Released November 13, 2025; online survey of 125 U.S. contractors (97 general contractors, 28 subcontractors). Report · Announcement. Source of the $299B figure, the 14% framing, the 65 hours a month, the 88% declined-to-bid figure, and the 91% payment-reputation figure.
  • Rabbet. 2024 Construction Payments Report ($280B) and 2022 Construction Payments Report ($208B, a 53% increase over 2021). Reports index · 2022 coverage, Construction Dive.
  • CFMA. 2026 Construction Financial Benchmarker, released September 2026; 1,359 verified financial statements screened from a survey of roughly 10,000 firms, fielded with Industry Insights and CICPAC. Net income before taxes 6.8%, up from 6.7%. CFMA Benchmarker.
  • Texas Property Code Chapter 28 (Prompt Payment to Contractors and Subcontractors), §§ 28.002, 28.004, 28.0091. Porter Hedges overview · 2023 amendments on unsigned change orders.
  • Texas Property Code § 53.101 (reserved funds) and H.B. 2237, 87th Legislature, effective January 1, 2022. Bill text · Allensworth summary.
  • The $20M reference model, the $95/hour loaded-rate arithmetic on Rabbet's 65 hours, and every application to contractor operations are ours. The model is illustrative and built from stated assumptions; it is not survey data and describes no specific company. Nothing here is legal, tax, or accounting advice — confirm it with your attorney and your CPA before acting on it.
Related posts
AI Infrastructure

Your Labor Burden Is Not 35%. The BLS Says the Floor Is 44%.

October 8, 2026
AI Infrastructure

What We Told Our AI Receptionist Never to Do

August 3, 2026
Start here

See where you
actually stand.

The AI Visibility Audit runs your company through all six layers and delivers instant results. $27. Specific to your business, trade, and market.

Get the AI Visibility AuditExplore the Method
Get the audit